Family owned since 1998 · Painting Melbourne homes and businesses

Free site inspection · Next-day quotes1300 61 61 51

Get a free quote

AMP 10 · New construction

New construction painting in Melbourne

We partner with Melbourne builders, interior designers and architects to paint new homes, apartments and commercial buildings. You get a crew that turns up when the programme says, works safely on site and hands over clean.

Building plans with a hard hat, gloves and safety glasses

New build work

  • New homes
  • Townhouse developments
  • Apartment blocks
  • Commercial buildings
  • Extensions and fit-outs
  • Painting to finish schedules

Working with your programme

  1. 01Planning and scoping. We review drawings and finish schedules and quote to the spec.
  2. 02Colour and finish sign-off. Samples and test areas approved before full production.
  3. 03Site compliance. Construction inductions and OH&S procedures on every site.
  4. 04Prep and masking. Thorough preparation so the finish passes inspection first time.
  5. 05Quality check and handover. Final inspection with the builder, defects closed promptly.

Who we work with

We work with builders, developers, interior designers and architects on new homes, townhouse developments, apartment blocks, commercial buildings, extensions and fit-outs. Whether you need a crew for one house or a staged development, we plan labour against your programme and keep your site supervisor updated as each stage finishes.

New surfaces need the right start

New work looks simple but has its own traps. New plasterboard needs a sealer or undercoat so the top coats dry evenly and the joins do not show through. New timber and MDF trims need priming on every face. New render needs time to cure before it is coated: at least 28 days (Taubmans), and four to eight weeks before a texture coating (Dulux), depending on thickness and weather. We check moisture with a meter rather than painting to a date, and our guide to painting rendered walls explains why.

Building curing time into the programme early avoids the most common new-build paint failure: coatings going onto render or masonry that is still wet.

Painting to specification

We quote and paint to your drawings and finish schedule, using the Dulux, Taubmans or Wattyl systems specified. Before full production, samples and test areas are signed off, so colour, sheen and finish level are agreed before the whole building is painted. If the specification leaves something open, we raise it at the scoping stage rather than on site.

On site with other trades

Painters usually follow plasterers and carpenters and work alongside electricians, plumbers and floor layers. We coordinate with your site supervisor on sequencing, protect finished surfaces such as joinery and floors, and come back for touch-ups after other trades have finished. Every site runs under our OH&S procedures, and our team holds construction induction and Working with Children checks, backed by $10M public liability insurance.

Colour and finish sign-off

Colours that look right on a sample board can read differently across a whole facade or a long apartment corridor. Test areas on site let the builder, designer or client see the actual colour, sheen and finish level in place, under the building’s own light, before production starts. Once they are approved, the same products and colours are used throughout, so finishes stay consistent from the first unit to the last.

Handover and defects

At the end of each stage we inspect the work with the builder and close out defects promptly, so the finish passes the client’s inspection first time. Every job comes with our written 7-year guarantee covering our workmanship.

What affects the price of new construction painting

New build work is quoted from drawings and the finish schedule, followed by a site visit. The main factors are the area and number of surfaces, the specified coating systems and finish levels, the number of colours, access and height, and how the work is staged across the programme. Our guide to what a painting quote should include lists what a complete quote covers.

Backed by our 7-year guarantee

Every job is covered by a written 7-year satisfaction guarantee and $10M public liability insurance. We are a member of Master Painters Australia and our team is Working with Children checked.

New construction questions

Do you work to a builder’s programme?

Yes. We plan crews against your programme and keep the site supervisor updated as stages finish.

Can you quote from drawings?

Yes. We review drawings and finish schedules and quote to the specification, then confirm details with a site visit.

How long does new render need before painting?

New cement render needs to cure first: at least 28 days, and up to eight weeks for some coatings, depending on thickness and weather. We check moisture with a meter before coating.

Do you come back for touch-ups after other trades?

Yes. We close out defects and touch up after other trades as part of handover, so the finish is right when the client inspects it.

Are your crews inducted for construction sites?

Yes. Our team holds construction induction and Working with Children checks, works under documented OH&S procedures, and we carry $10M public liability insurance.

New construction advice

All painting advice →

Get your new construction quoted

Book a free site inspection and get your written quote the next day.

Call nowFree quote